Product Description
The product owns excellent mechanical property and the faster crosslink speed. Comply with Rohs and Reach, applicable for building wire.
Trade Mark and Appilcation
Trade Mark |
Product Name |
Application |
YT-1254 |
125ºC Silane-crosslinked halogen-free low-smoke B1 flame-retardant polyolefin cable material |
Applicable for pressure-extrusion and tube-extrusion, super high performance flame retardant |
Performance Indexes
NO |
Test Items |
|
Unit |
YT-1254 |
1 |
Appearance |
|
- |
Compliance |
2 |
Density |
|
g/cm3 |
1.64 |
3 |
Original Tensile Strength |
|
Mpa |
11 |
4 |
Original Elongation at Break |
|
% |
180 |
5 |
Thermal Ageing |
Test Condition |
- |
158ºCx168h |
Rentention Rate of Tensile Strength |
% |
+20 |
Retention Rate of Elongation at Break |
% |
-20 |
6 |
Low-temperature Impact |
Test Conditions |
- |
-40ºC |
Failure (≤15/30) |
Piece |
0 |
7 |
Oxygen Index |
|
% |
42 |
8 |
Volume Resistivity (20ºC) |
|
Ω.m |
1x10(12) |
9 |
Dielectric Strength (20ºC) |
|
MV/m |
25 |
10 |
Thermal Elongation |
Test Conditions |
- |
200 ºC 0.2Mpa 15min |
Elongation Rate Under the load |
% |
45 |
Permanent Change Rate after cooling |
% |
+2.5 |
11 |
PH Value |
|
- |
5.1 |
12 |
Conductivity |
|
μs/mm |
1 |
13 |
Smoke Density |
With Flame |
Ds Max |
50 |
Without Flame |
Ds Max |
145 |
Can be customized according to customer's requirements.
Use Methods
1. Mixing: Mix the component A and component B evenly, add them into the hopper. If the color required, use the EVA base materials (the color masterbatch should be dried). The material should be use up within 2 hours after unpacking. (It can't be dried). The external water can' be brought in during the process.
2. Suggest to use equal distance & unequal depth, single thread screw.
3. Extrusion Temperature:
Zone 1 |
Zone 2 |
Zone 3 |
Zone 4 |
Neck |
Head |
100±10 |
125±10 |
135±10 |
140±10 |
140±10 |
140±10 |
4. Double color cable: Color line can use component A and EVA base materials together, without or with a small numner of component B.
5. Pay-off speed: Without affecting of surface smoothness and perfirmance the faster, the better.
6. Crosslink:
Natural crosslink or water bath (Steam).
Natural Crosslink: Temperature 15-25ºC, crosslink will be finished around 7 days.
hen temperature is higher than 25ºC, crosslink will be finished around 3 days.
Water bath or Steam: should control the temperature arond 60-70 ºC in order to keep it from sticking together, it will finish about 4 hours. The thickness of the test piece is 1mm. It thickness >1mm, the crosslink time should be adjusted according to the actual situation. Full performance test, water bath (steam) 65ºC, more than 8 hours, to ensure the material is fully crosslinked.
Package, Transport and Storage
1. Package: Vacuum packed.
2. Transport: Can't be exposed to the sun or rain, or suffer mechanical damange.
3. Storage: Should be stacked on the backing plate in a clean and dry warehouse.
Valid Period: 12 months.